Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Power Maintenance – Sunday 6th Dec 2009
#1
The facility engineering team will be conducting power maintenance beginning at 02:00 GMT lasting until 06:00 on Sunday 6th Dec 2009.

Scope of work: Functional test of the new equipment installed during the maintenance on the 4th Dec 2009.

The commercial supply will be disconnected in a controlled manner by power engineers. This work will ensure the correct operation of the breakers in the Low Voltage equipment in switching the power source on to the Generators. A full risk assessment has been carried out and as an additional precaution; manufacturers will be onsite along with our data-centre engineers.

Outage: We do not anticipate any downtime during this testing.
Support
Webnetics UK Ltd.
Reply


Forum Jump:


Users browsing this thread: 2 Guest(s)