Power Maintenance – Sunday 6th Dec 2009 - Printable Version +- Webnetics UK Ltd. - Forums (https://www.webneticsuk.com/forum) +-- Forum: News & Announcements (https://www.webneticsuk.com/forum/forumdisplay.php?fid=2) +--- Forum: Network Status / Server Upgrades (https://www.webneticsuk.com/forum/forumdisplay.php?fid=21) +--- Thread: Power Maintenance – Sunday 6th Dec 2009 (/showthread.php?tid=174) |
Power Maintenance – Sunday 6th Dec 2009 - webnetics - 05-12-09 The facility engineering team will be conducting power maintenance beginning at 02:00 GMT lasting until 06:00 on Sunday 6th Dec 2009. Scope of work: Functional test of the new equipment installed during the maintenance on the 4th Dec 2009. The commercial supply will be disconnected in a controlled manner by power engineers. This work will ensure the correct operation of the breakers in the Low Voltage equipment in switching the power source on to the Generators. A full risk assessment has been carried out and as an additional precaution; manufacturers will be onsite along with our data-centre engineers. Outage: We do not anticipate any downtime during this testing. |